MARCELLUS SHALE US SITE MAP
Home     Contact
Terms of Use
ALL HAIL
Marcellus Shale
DRILLING NEWS CURRENT EVENTS
Blogs     Links
Toxics Release Inventory
Meetings
O&G Drilling News
Now Drilling
Pennsylvania Bulletin
Shale Gas News
AERIAL PHOTOS OF SHALE DRILLING
Aerial photographs of Marcellus Shale activities
Marcellus Air II
Marcellus Air III
West Virginia Marcellus Shale
Marcellus Air -
WV Panhandle
Ohio Utica Shale
Marcellus Air V
Marcellus Air 8
Northeast Pennsylvania fracking
MARCELLUS
LEGISLATION
Penna. Act 13
Drilling Legislation
Political Contributions
Engaged Citizens
Forced Pooling
Halliburton Loophole
Marcellus Documents
Pennsylvania DEP
The FRAC Act
SHALE GAS
PLAYS
Gas Plays
Glossary
Utica Shale
MARCELLUS RIVER BASINS
Delaware River
Basin Commission
Ohio River Valley ORSANCO
Susquehanna River
Basin Commission
MARCELLUS SHALE WATER
Beaver Run Reservoir
Blake Run Falls
Creeks & Waterways
Cross Creek Lake
Dunkard Creek
Monongahela River
Piping water
Wanted: Water
Water Management Plans for SW Pa.
WV Water Project
DRILLING WASTE & WASTEWATER
Clairton Municipal
Disposal Wells
McKeesport Municipal
Shale Wastewater
WASTE FACILITY REPORTS
2009-2010 Late-2010
Early-2011 Late-2011
Early-2012 Late-2012
Early-2013 Late-2013
MARCELLUS
ACCIDENTS
Atlas Frac Pit Fire
Gas Well Fires
Seeps, Leaks, Spills
Violations Tip Line
EXPLORATION & PRODUCTION ISSUES
Intro to Marcellus
Air-testing / Air-quality
Before You Lease
Carol Baker Impoundment
New!
Centralized Impoundment Dams
Forest Fragmentation
Frac Sand
Fracking
Fracking Near Schools
Gas Flares
Impoundments
Lessons Learned
Marcellus FRAC
Natural Gas Prices
Radioactive Shale
Seismic Testing
Sick Cattle
Talking Points
Trinity Elementary
MARCELLUS DRILLING MEDIA & MOVIES
Christmas Carols
FrackNation
Gasland
New!
MSOCC
Promised Land
Triple Divide
Truthland
YouTube
FIRSTHAND
EXPERIENCES
Nancy Bevins
June Chappel
Jaime Frederick
Carol French
Terry Greenwood
Ron Gulla
Stephanie Hallowich
Pam Judy
Kimberlie McEvoy
Tim Ruggiero
Darrell Smitsky
Crystal Stroud
Calvin Tillman
Beth Voyles
Pets
GAS COMPRESSION & PROCESSING
Blue Racer Natrium
Cadiz Fractionator
Updated!
Compressor stations
Fort Beeler Gas Plant
Hastings Fractionator
Hickory Bend Cryogenic
Houston Gas Plant
Kensington Midstream
Lowry Compressor Station
Majorsville Gas Plant
Mobley Gas Plant
Moundsville Midstream
Oak Grove
Ohio Gas Refineries
Seneca Ohio Plant
Scio Ohio Plant
New!
Three Brothers Compressor Station
Tupta-Day Compressor Station
Welling Compressor Station
West Virginia Gas Refineries
SHALE GAS
PIPELINES
Appalachian Gateway
Gas Pipelines
Gathering Pipelines
Mariner East Pipeline
SHALE TRUCKING & TRANSPORTATION
Brine Truck Photos
Diesel Idling Act 124
Frac Trucks
Propane Trains
Road Damage
Rook Rail Yard
Truck Traffic
MARCELLUS
SHALE WELLS
Gas Well Photos
Production Declines
Avolio Unit
Baker, Carol Unit
Bedillion-Day Unit
Bednarski Unit
Best Production Pad
Bigley Unit
Black, William Unit
Chappel Unit
Chiarelli Pad
Costanzo Unit
Cowden 1H-2H
Cowden 3H-6H
Updated!
Cross Creek Park
Day Unit
Drugmand Unit
Engel Unit
Foster Unit
Franklin Lakeview Estates
Godwin Unit
Goettel Unit
Harbison Unit
Hoskins Unit
Kearns Unit
LBROS Unit
Lowry Unit
Miller, John Unit
Miller, Lois Unit
Ohio Valley LBC
Renz Well
Restored Well Sites
Rodenski Unit
Rush, John Unit
Sierzega Unit
Trax Farms
Troyer-Space Mgmt
Ward Unit
Weimer Unit
West, Eleanor
Worstell Unit
West Virginia wells

WELLING COMPRESSOR STATION
Buffalo Township, Washington County, Pa


UPDATES

One Less Engine at Welling Compressor
Station as a Result of Comments

On June 25, 2012, the Clean Air Council and Group Against Smog and Pollution (GASP) submitted comments on Plan Approval 63-00958A submitted by MarkWest which proposed to install five additional compressor engines, one diesel engine and capacity expansion of a dehydrator/reboiler at their Welling Compressor Station in Washington County. After reviewing the facilities calculations for its potential to emit pollution and pointing out various flaws, PA DEP was forced to recalculate. As PA DEP stated in their response to comments:

 

Upon review of all public comments received with the subject application and comparison of this application with that for another MarkWest facility with similar configuration, the Department reevaluated the emissions potential for CO2e at Welling and determined that as proposed, the CO2e emission potenial for Welling would be 100,071 tons per year of CO2e. On July 16, 2012, the Department conveyed this information to MarkWest. In response, MarkWest indicated that one of the proposed Waukesha P9390GSI engines would be removed from its proposal to ensure that Welling remained a minor source. Source: Clean Air Council

Welling Compressor Station in September 2014
Welling Compressor Station - September19, 2014
Compressor station tanks
 

MORE UPDATES

PENNSYLVANIA BULLETIN
MAY 26, 2012

AIR QUALITY PLAN APPROVAL AND OPERATING PERMIT APPLICATIONS NEW SOURCES AND MODIFICATIONS

The Department has developed an ‘‘integrated’’ plan approval, State Operating Permit and Title V Operating Permit program. This integrated approach is designed to make the permitting process more efficient for the Department, the regulated community and the public. This approach allows the owner or operator of a facility to complete and submit permitting documents relevant to its application one time, affords an opportunity for public input and provides for sequential issuance of the necessary permits.

The Department received applications for Plan Approvals or Operating Permits from the following facilities. Copies of these applications, subsequently prepared draft permits, review summaries and other support materials are available for review in the regional office listed before the applications. Persons interested in reviewing the application files should contact the appropriate regional office to schedule appointments.

Persons wishing to receive a copy of a proposed Plan Approval or Operating Permit shall indicate interests to the Department regional office within 30 days of the date of this notice and shall file protests or comments on a proposed Plan Approval or Operating Permit within 30 days of the Department providing a copy of the proposed documents to persons or within 30 days of its publication in the Pennsylvania Bulletin, whichever comes first. Interested persons may also request that hearings be held concerning a proposed Plan Approval or Operating Permit. A comment or protest filed with the Department regional office shall include a concise statement of the objections to the issuance of the Plan Approval or Operating Permit and relevant facts which serve as the basis for the objections. If the Department schedules a hearing, a notice will be published in the Pennsylvania Bulletin at least 30 days prior the date of the hearing.

Persons with a disability who wish to comment and require an auxiliary aid, service or other accommodation to participate should contact the regional office listed before the application. TDD users may contact the Department through the Pennsylvania AT&T Relay Service at (800) 654-5984.

Final Plan Approvals and Operating Permits will contain terms and conditions to ensure that the source is constructed and operating in compliance with applicable requirements in 25 Pa. Code Chapters 121—143, the Federal Clean Air Act (42 U.S.C.A. §§ 7401—7671q) and regulations adopted under the Federal Clean Air Act.

Intent to Issue Plan Approvals and Intent to Issue or Amend Operating Permits under the Air Pollution Control Act (35 P. S. §§ 4001—4015) and 25 Pa. Code Chapter 127, Subchapter B. These actions may include the administrative amendments of an associated operating permit.

63-00958A: MarkWest Liberty Midstream and Resources, LLC (1515 Arapahoe Street Tower 2, Suite 700, Denver, CO 80202-2126) for installation and temporary operation of the following additional sources and for modifications to the following existing sources to accommodate an increase in maximum natural gas throughput at the MarkWest Welling Compressor Station (‘‘Welling’’), a natural gas compressor station located in Buffalo Township, Washington County.

In accordance with 25 Pa. Code §§ 127.44—127.46 that the Department of Environmental Protection (DEP) intends to issue Air Quality Plan Approval PA-63-00958A to MarkWest Liberty Midstream and Resources, LLC (‘‘MarkWest’’) for installation and temporary operation of the following additional sources and for modifications to the following existing sources to accommodate an increase in maximum natural gas throughput at the MarkWest Welling Compressor Station (‘‘Welling’’), a natural gas compressor station located in Buffalo Township, Washington County: installation of five (5) natural gas-fired compressor engines each rated at 1,980 bhp; installation of one (1) additional 197-bhp diesel engine for emergency power generation; increase the gas throughput capacity of the previously installed TEG dehydrator from 100 MMscfd to 130 MMscfd, and increase the associated dehydrator re-boiler rating from 2.0 MMBtu/hr to 2.5 MMBtu/hr. Additionally, Plan Approval PA-63-00958 as issued on February 24, 2011, which previously authorized installation and temporary operation of four (4) 1,980 bhp natural gas-fired compressor engines, two (2) 1,380 bhp natural gas-fired compressor engines, the above referenced 100 MMscfd dehydrator and 2.0 MMBtu/hr reboiler, one (1) 500 bbl separation tank, three (3) 400 bbl condensate tanks, and one (1) 400 bbl saltwater tank at Welling will be administratively incorporated into Plan Approval PA-63-00958A.

Potential emissions from the facility are estimated to be 58.7 tons of nitrogen oxides (NOx), 49.0 tons of carbon monoxide (CO), 49.2 tons of volatile organic compounds (VOC), 5.97 tons of total particulate matter (PM), 2.86 tons of formaldehyde (HCHO), 7.58 tons of hazardous air pollutants (HAP), and 89,422 tons of greenhouse gases (GHG or CO2e) per year.

The plan approval will include federally enforceable emission limits on the engines for NOx, CO, and VOC. Best available technology (BAT) for the proposed engines includes combusting natural gas, rich burn combustion for each engine controlled by and three-way catalysts (NSCR), good combustion practices including the use of automatic air/fuel ratio controllers, and proper maintenance and operation. BAT for the dehydrator/reboiler includes operation of the unit with a flare. The authorization is subject to applicable State regulations, Federal New Source Performance Standards (NSPS) including 40 CFR Part 60 Subpart JJJJ for spark ignition internal combustion engines, and Federal National Emission Standards for Hazardous Air Pollutants (NESHAPS) including 40 CFR Part 63 Subpart HH for oil and natural gas production facilities and Subpart ZZZZ for stationary reciprocating internal combustion engines.

Federal requirements for Mandatory Greenhouse Gas Reporting from 40 CFR Part 98 have also been included in this Plan Approval. Compliance with emission limitations will be demonstrated through stack testing. Plan Approval has been conditioned to ensure compliance with all applicable rules and regulations including but not limited to those identified above. Once compliance with the Plan Approval is demonstrated, the applicant will subsequently apply for a State Only Operating Permit in accordance with 25 Pa. Code Subchapter F.

Those who wish to provide the Department with additional written information that they believe should be considered prior to the issuance of the Plan Approval may submit the information to Devin P. Tomko, Pennsylvania Department of Environmental Protection, 400 Waterfront Drive, Pittsburgh, PA, 15222. Each written comment must contain the name, address and telephone number of the person submitting the comments, identification of the proposed Plan Approval (PA-63-00958A) and a concise statements regarding the relevancy of the information or objections to issuance of the Plan Approval.

All comments must be received prior to the close of business 30 days after the date of this publication. For additional information you may contact Devin P. Tomko at 412-442-5231. Department of Public Health, Air Management Services: 321 University Avenue, Philadelphia, PA 19104 Contact: Edward Wiener, Chief—Telephone: 215-685-9426.


February 11, 2012 - PA. BULLETIN
WELLING COMPRESSOR STATION
BUFFALO TWP, WASHINGTON COUNTY, PA

63-00958A: Markwest Liberty Midstream & Resources, LLC (1515 Arapahoe Street, Tower 2 Suite 700, Denver, CO 80202) to expand their Welling Compressor Station, an existing facility, with up to an additional five (5) engines. Based on emission projections the facility will remain a minor source of air pollutants. The facility is in Buffalo Township, Washington County.

Southwest Region: Air Quality Program, 400 Waterfront
Drive, Pittsburgh, PA 15222-4745
Contact: M. Gorog & B. Hatch, Environmental Engineer
Managers—Telephone: 412-442-4163/5226

 

Welling Compressor Station

 
PAGE INDEX
 
BUFFALO TOWNSHIP, PA - In 2010, news came of a proposed compressor station in Buffalo Township, Washington County, Pa on Carlisle Road. The former Carlisle farm is now the Welling farm and a lease was signed for acreage to build this new MarkWest compressor station.

Unlike many compressor stations that start out with 2 compressors and grow to 5 compressors, this compressor station has plans for 14 compressors, making it one of the largest in the United States, actually rivaling compression horsepower by DISH Texas..
 

Tentative Timeline for the
Welling Compressor Station

Phase Compressors Date
Phase 1

2 Nat Gas

March 2011
Phase 2 6 Nat Gas May 2011
Phase 3 6 Electric March 2012

Buffalo Township
Conditional Use Request
Planning Commission Draft
(PDF-1.1MB)

The intent is to build this compression complex in these 3 stages, eventually operating all 14 compressors at one time. The highest peak on one of the compression buildings would be 35-feet. Landscaping to screen the building calls for two rows of 6-foot evergreen trees and one row of 12 foot trees. Shown below is the permit for the first two 1380 horsepower Caterpillar natural gas compressors.

Another new compressor station

National Fuel Gas Supply Corporation has initiated plans for another compressor station in Buffalo Township, not more than two miles to the south of this Welling Compressor Station. The "Buffalo Compressor Station" is to be located at 165 Coffeys Crossing Road, Washington, Pa. The initial permit for two 2,370 horsepower natural gas compressors was issued 11/15/10. There have been indications that two more compressors will be added at a later date.
DEP details:
Buffalo Comp Sta
Authorization ID: 827417
Permit number: 63-00955A


PRE-CONSTRUCTION PHOTOS
Photos of the Welling Compressor Station
site before excavation in summer 2010
 
 
CONSTRUCTION PHOTOS
Welling Farm - 1897
Fall 2010
Welling Farm in the foreground is
dwarfed by the huge excavation
for the Welling Compressor Station
 
 
 

K B CARLISLE -1897- BARN

Old barn near the new compressor station:
1897
K B CARLISLE
 
 

Compressor station excavation

Mid-November 2010 excavation work
 
 

Cattle graze in a field near the new site
 
 
Welling Compressor Station grading
Large area has been leveled-off for the huge
MarkWest compressor station
 
 
 
 
Erosion matting on slope
Front slope near Carlisle Road
 
 
Erosion matting in place on steep slopes
 
 
Slopes near Carlisle Road
Looking back up Carlisle Road toward the
new compressor station site and farm
 
 
Final phase of excavation work
taking place on Welling Farm
 
 
Group of condensate tanks near Carlisle Road
 
 
FLIR VIDEO OF THESE CONDENSATE TANKS
MAY 3, 2012
 
 
 
 
February 2011
First compressors in place
 
 
March 2011
Construction of compressor building
 
 
 
 
 
 
 
 
natural gas compressor station
October 2011
Latest building has been added
 
 
Welling Compressor Station in early December 2011
December 2011
 
 
compressor station
 
 
Welling Compressor Station December 15, 2012
December 15, 2012
 
 
  PERMITTING
 
As of July 9, 2014
 
Authorization ID: 1031026
Permit number: 63-00958A
Site: WELLING COMP STA
Client: MARKWEST LIBERTY MIDSTREAM & RESOURCES LLC
Authorization type: Minor Facility Plan Approval New Source Performance Std
Application type: Extension
Authorization is for: FACILITY
Date received: 06/23/2014
Status: Issued on 7/9/2014

Sub-Facilities for Authorization

Sub-Facility ID Sub-Facility Name Description
1033512 CATERPILLAR ENGINE 1 OXIDATION CATALYST Air Pollution Control Device
1033514 CATERPILLAR ENGINE 2 OXIDATION CATALYST Air Pollution Control Device
1019827 CATERPILLAR G3516B COMPRESSOR ENGINE 1 (1380 BHP) Process
1019828 CATERPILLAR G3516B COMPRESSOR ENGINE 2 (1380 BHP) Process
1078539 GLYCOL DEHYDRATOR (130 MMSCFD) W/2.5 MMBTU/HR REBOILER Process
1033509 JOHN DEERE DIESEL ENGINE 1 (197 BHP) Process
1078575 JOHN DEERE DIESEL ENGINE 2 (197 BHP) Process
1078578 JOHN DEERE ENGINE 1 OXIDATION CATALYST Air Pollution Control Device
1078577 JOHN DEERE ENGINE 2 OXIDATION CATALYST Air Pollution Control Device
1045833 MISC VOCS, TANKS, LEAKS, BLOWDOWNS, ETC Process
1078541 REBOILER FLARE Air Pollution Control Device
1079093 STORAGE TANK VAPOR RECOVERY UNIT (VRU) Air Pollution Control Device
1079092 STORAGE TANKS Process
1033515 WAUKESHA ENGINE 1 THREE-WAY CATALYST Air Pollution Control Device
1033516 WAUKESHA ENGINE 2 THREE-WAY CATALYST Air Pollution Control Device
1033517 WAUKESHA ENGINE 3 THREE-WAY CATALYST Air Pollution Control Device
1033518 WAUKESHA ENGINE 4 THREE-WAY CATALYST Air Pollution Control Device
1078520 WAUKESHA ENGINE 5 THREE-WAY CATALYST Air Pollution Control Device
1078521 WAUKESHA ENGINE 6 THREE-WAY CATALYST Air Pollution Control Device
1033496 WAUKESHA P9390GSI COMPRESSOR ENGINE 1 (1980 BHP) Process
1033497 WAUKESHA P9390GSI COMPRESSOR ENGINE 2 (1980 BHP) Process
1033498 WAUKESHA P9390GSI COMPRESSOR ENGINE 3 (1980 BHP) Process
1033499 WAUKESHA P9390GSI COMPRESSOR ENGINE 4 (1980 BHP) Process
1078515 WAUKESHA P9390GSI COMPRESSOR ENGINE 5 (1980 BHP) Process
1078516 WAUKESHA P9390GSI COMPRESSOR ENGINE 6 (1980 BHP) Process

 

 

As of May 28, 2012
 
 
Authorization ID: 911754
Permit number: 63-00958A
Site: WELLING COMP STA
Client: MARKWEST LIBERTY MIDSTREAM & RESOURCES LLC
Authorization type: Minor Facility Plan Approval New Source Performance Std
Application type: New
Authorization is for: FACILITY
Date received: 01/25/2012
Status: Pending

Sub-Facilities for Authorization
Sub-Facility ID Sub-Facility Name Description
1033512 CATERPILLAR ENGINE 1 OXIDATION CATALYST Air Pollution Control Device
1033514 CATERPILLAR ENGINE 2 OXIDATION CATALYST Air Pollution Control Device
1019827 CATERPILLAR G3516B COMPRESSOR ENGINE 1 (1380 BHP) Process
1019828 CATERPILLAR G3516B COMPRESSOR ENGINE 2 (1380 BHP) Process
1078539 GLYCOL DEHYDRATOR (130 MMSCFD) W/2.5 MMBTU REBOILER Process
1033509 JOHN DEERE DIESEL ENGINE (197 BHP) Process
1078575 JOHN DEERE DIESEL ENGINE (197 BHP) #2 Process
1078578 JOHN DEERE ENGINE 1 OXIDATION CATALYST Air Pollution Control Device
1078577 JOHN DEERE ENGINE 2 OXIDATION CATALYST Air Pollution Control Device
1045833 MISC VOCS, TANKS, LEAKS, BLOWDOWNS, ETC Process
1078541 REBOILER FLARE Air Pollution Control Device
1033515 WAUKESHA ENGINE 1 THREE-WAY CATALYST Air Pollution Control Device
1033516 WAUKESHA ENGINE 2 THREE-WAY CATALYST Air Pollution Control Device
1033517 WAUKESHA ENGINE 3 THREE-WAY CATALYST Air Pollution Control Device
1033518 WAUKESHA ENGINE 4 THREE-WAY CATALYST Air Pollution Control Device
1078520 WAUKESHA ENGINE 5 THREE-WAY CATALYST Air Pollution Control Device
1078521 WAUKESHA ENGINE 6 THREE-WAY CATALYST Air Pollution Control Device
1078523 WAUKESHA ENGINE 7 THREE-WAY CATALYST Air Pollution Control Device
1078524 WAUKESHA ENGINE 8 THREE-WAY CATALYST Air Pollution Control Device
1078525 WAUKESHA ENGINE 9 THREE-WAY CATALYST Air Pollution Control Device
1033496 WAUKESHA P9390GSI COMPRESSOR ENGINE 1 (1980 BHP) Process
1033497 WAUKESHA P9390GSI COMPRESSOR ENGINE 2 (1980 BHP) Process
1033498 WAUKESHA P9390GSI COMPRESSOR ENGINE 3 (1980 BHP) Process
1033499 WAUKESHA P9390GSI COMPRESSOR ENGINE 4 (1980 BHP) Process
1078515 WAUKESHA P9390GSI COMPRESSOR ENGINE 5 (1980 BHP) Process
1078516 WAUKESHA P9390GSI COMPRESSOR ENGINE 6 (1980 BHP) Process
1078517 WAUKESHA P9390GSI COMPRESSOR ENGINE 7 (1980 BHP) Process
1078518 WAUKESHA P9390GSI COMPRESSOR ENGINE 8 (1980 BHP) Process
1078519 WAUKESHA P9390GSI COMPRESSOR ENGINE 9 (1980 BHP) Process

As of October 2, 2011
 
Authorization ID: 895252
Permit number: 63-00958
Site: WELLING COMP STA
Client: MARKWEST LIBERTY MIDSTREAM & RESOURCES LLC
Authorization type: Minor Facility Plan Approval New Source Performance Std
Application type: Modification
Authorization is for: FACILITY
Date received: 09/06/2011
Status: Issued 09/27/2011

Sub-Facilities for Authorization

Sub-Facility ID Sub-Facility Name Description
1033512 CATERPILLAR ENGINE 1 OXIDATION CATALYST Air Pollution Control Device
1033514 CATERPILLAR ENGINE 2 OXIDATION CATALYST Air Pollution Control Device
1019827 CATERPILLAR G3516B COMPRESSOR ENGINE 1 (1380 BHP) Process
1019828 CATERPILLAR G3516B COMPRESSOR ENGINE 2 (1380 BHP) Process
1033519 DEHYDRATOR FLARE Air Pollution Control Device
1033500 GLYCOL DEHYDRATOR (100 MMSCF/DAY) Process
1033509 JOHN DEERE DIESEL ENGINE (197 BHP) Process
1033515 WAUKESHA ENGINE 1 THREE-WAY CATALYST Air Pollution Control Device
1033516 WAUKESHA ENGINE 2 THREE-WAY CATALYST Air Pollution Control Device
1033517 WAUKESHA ENGINE 3 THREE-WAY CATALYST Air Pollution Control Device
1033518 WAUKESHA ENGINE 4 THREE-WAY CATALYST Air Pollution Control Device
1033496 WAUKESHA P9390GSI COMPRESSOR ENGINE 1 (1980 BHP) Process
1033497 WAUKESHA P9390GSI COMPRESSOR ENGINE 2 (1980 BHP) Process
1033498 WAUKESHA P9390GSI COMPRESSOR ENGINE 3 (1980 BHP) Process
1033499 WAUKESHA P9390GSI COMPRESSOR ENGINE 4 (1980 BHP) Process

 


As of February 6, 2011
 
 
 

As of November 18, 2010
 

Site ID:

737891

Site Name:

WELLING COMPRESSOR STATION ESCGP-EXPEDITED

Address:

Carlisle Road

Status:

Active

 

Clients

Client List

MARKWEST LIBERTY MIDSTREAM
& RESOURCES LLC (271958)

PA Municipalities

Municipalities/Counties

Buffalo Township
Washington County

 

Site Permits

Authorization Id

Authorization Type

Date Received

Status/Date

845097

Expedited E&S Stormwater General Permit 1

08/13/2010

Issued 08/25/2010

 

Facility Permits

No records matched the criteria.

 

Site-Level and Primary Facility-Level Inspections

Inspection ID

Inspection Date

Inspection Type

Inspection Results

1908075

08/24/2010

Administrative/File Review

In Compliance with Policy

 


 
 

Site ID:

737309

Site Name:

WELLING COMP STA

Address:

REED RD & CARLISLE RD

Status:

Active

 

Clients

Client List

MARKWEST LIBERTY MIDSTREAM & RESOURCES LLC (271958)

Programs

DEP Programs

Air Quality

PA Municipalities

Municipalities/Counties

Buffalo Township
Washington County

 

Site Permits

Authorization Id

Authorization Type

Date Received

Status/Date

843168

Minor Facility Plan Approval New Source Performance Std

06/14/2010

Pending

843155

AQ General Permit

07/07/2010

Issued 09/02/2010

 

Facility Permits

Authorization Id

Authorization Type

Date Received

Status/Date

843151

AQ General Permit

07/07/2010

Issued 09/02/2010

 

Authorization ID:

843168

Permit number:

63-00958

Site:

WELLING COMP STA

Client:

MARKWEST LIBERTY MIDSTREAM & RESOURCES LLC

Authorization type:

Minor Facility Plan Approval New Source Performance Std

Application type:

New

Authorization is for:

FACILITY

Date received:

06/14/2010

Status:

Pending

 
 

 
 

Authorization ID:

843155

Permit number:

GP9-63-00958

Site:

WELLING COMP STA

Client:

MARKWEST LIBERTY MIDSTREAM & RESOURCES LLC

Authorization type:

AQ General Permit

Application type:

New

Authorization is for:

FACILITY

Date received:

07/07/2010

Status:

Issued 09/02/2010

 

Authorization ID:

843151

Permit number:

GP5-63-00958

Site:

WELLING COMP STA

Client:

MARKWEST LIBERTY MIDSTREAM & RESOURCES LLC

Authorization type:

AQ General Permit

Application type:

New

Authorization is for:

FACILITY

Date received:

07/07/2010

Status:

Issued 09/02/2010


Sub-Facilities for Authorization

Sub-Facility ID

Sub-Facility Name

Description

1019828

CATERPILLAR G3516B COMPRESSOR ENGINE (1380 BHP)

Process

1019827

CATERPILLAR G3516B COMPRESSOR ENGINE (1380 BHP)

Process

 
 

AUGUST 14, 2010

The Pennsylvania Bulletin
[40 Pa.B. 4666]
Saturday, August 14, 2010

PLAN APPROVALS

Plan Approval Applications Received under the Air Pollution Control Act 4001-4015 and Pa.Code Chapter 127, Subchapter B that may have(35 P.S. §§ special public interest. These applications are in review and no decision on disposition has been reached.

Air Quality Program, 400 Waterfront Drive, Pittsburgh,Southwest Region: PA 15222-4745. Contact: M. Gorog and B. Hatch, Environmental Engineer Managers—Telephone: 412-442-4163/5226.

63-00958: Markwest Liberty Midstream and Resources, LLC (1515 Arapahoe Street, Tower 2 Suite 700, Denver, CO 80202) for proposed Welling Compressor Station in Buffalo Township, Washington County.

 

 
OPPOSITE SIDE OF CARLISLE ROAD
FROM COMPRESSOR STATION
 
In an area that has already seen new gas pipeline
work, further excavation is taking place 
Burning excavated debris during construction
 
 
House across the road from the new compressor
station is surrounded by construction activity
 
 
 